Solar Power Generation
Our engineering capabilities help us design cost-efficient projects, which are backed by a thorough analysis of the land, solar radiation, grid connection infrastructure and emerging technologies. Our project design also considers various factors such as the geographical location, climate conditions, temperature and its impact on equipment, local facilities as well as potential maintenance requirements. We thus ensure that all our capital investment projects are carried out after considering and studying the risks involved.
Featured

Featured

Featured
Solar Power


Hattigudur, Karnataka
50 MW
Commissioned

Holenarsipura , Karnataka
20 MW
Commissioned

Khavda, Gujarat
2000 MW
Commissioned

KR Pet, Karnataka
20 MW
Commissioned

Maskal, Karnataka
50 MW
Commissioned

Pavagada, Karnataka
350 MW
Commissioned

Periyapatna, Karnataka
20 MW
Commissioned

Durg, Chhattisgarh
100 MW
Commissioned

Madhuvanahally, Karnataka
100 MW
Commissioned

Budhlada, Punjab
30 MW
Commissioned

Kalpi, Uttar Pradesh
100 MW
Commissioned

Kekkireni, Telangana
100 MW
Commissioned

Nabarangpur, Odisha
40 MW
Commissioned

Nalagonda, Telangana
50 MW
Commissioned

Siddipet, Telangana
50 MW
Commissioned

Sindagi , Karnataka
5 MW
Commissioned

Basavana Bagewadi, Karnataka
20 MW
Commissioned

Byadagi, Karnataka
20 MW
Commissioned

Channapatanna, Karnataka
20 MW
Commissioned

Anantpur, Andhra Pradesh
250 MW
Commissioned

Gani , Andhra Pradesh
400 MW
Commissioned

Gubbi, Karnataka
20 MW
Commissioned

Khirsara, Gujarat
250 MW
Commissioned

Jhansi, Uttar Pradesh
50 MW
Commissioned


Jalalabad, Uttar Pradesh
50 MW
Commissioned

Mahoba, Uttar Pradesh
70 MW
Commissioned

Medak, Telangana
25 MW
Commissioned

Pokharan and Phalodi, Rajasthan
630 MW
Commissioned

Sahaswan, Uttar Pradesh
50 MW
Commissioned

Jevargi, Karnataka
20 MW
Commissioned

Bagalkot, Karnataka
5 MW
Commissioned

Bijapur, Karnataka
20 MW
Commissioned

Gulbarga, Karnataka
5 MW
Commissioned

Indi, Karnataka
20 MW
Commissioned

Muddebihal, Karnataka
20 MW
Commissioned

Kallur, Karnataka
100 MW
Commissioned

Kanasar, Rajasthan
20 MW
Commissioned

Kilaj, Maharashtra
20 MW
Commissioned

Maaluru, Karnataka
20 MW
Commissioned

Sardarghar and Chuge Kalan , Punjab
100 MW
Commissioned

Magadi, Karnataka
20 MW
Commissioned

Rajeshwar, Karnataka
50 MW
Commissioned

Ramanagara, Karnataka
60 MW
Commissioned

Rawra, Rajasthan
300 MW
Commissioned

Shorapur, Karnataka
10 MW
Commissioned

T Narasipura, Karnataka
20 MW
Commissioned

Tipatturu, Karnataka
20 MW
Commissioned

Bhadla, Jodhpur, Rajasthan
600 MW
Commissioned

Bikaner, Rajasthan
300 MW
Commissioned